Project information
Location:
Germany
Customer product:
Double Wall Plant, Power
Project description
Performance RT: Planung
Plant capacity: 320 m² double wall/shift or 750 m² girder slab/shift
Hall: Area 2.550 m², Clearabce 8,10 m
Personnel: 12 employees/shift (wall) 10 employees/shift (slab)
Plant concept:
- Double wall 180 – 400 mm
- Double wall production extendable into a multifunctional plant
- 40 pallets L/W 12,50 m/3,28 m
- A high automation level even without robot
- Possibilty to roduce core insulated double walls
- Direct concrete transfer from a new mixing plant
- Divided hall
- Possibility to load simultaneously up to 3 trailers in the hall
- A low cost and very adaptive plant
Project description
Our customer demanded to invest in a high performance plant equipped with machine technology that is easy to handle, but does not require any complex robot technology. In close co-operation with the customer an exact definition of the product, the future product completion as well as the performance was made. The optimization of the data, integration between the technical office, the production facilities, logistics, workstations and material handling lead to a manageable plant that is easy to use.
Conclusion:
An optimized plant wiht high potential. The technology is planned for producing lattice girder slabs as well with only minor adjustment and without productivity loss.
With few more steps the production of solid walls would be possible as well, including finishing the surface.